– Unpacked and laid out all parts, hardware, and tools.
– Attached the legs securely to the tabletop using pre-drilled holes.
– Assembled and installed the drawer, ensuring smooth glide on the track.
– Unpacked and laid out all parts, hardware, and tools.
– Attached the legs securely to the tabletop using pre-drilled holes.
– Assembled and installed the drawer, ensuring smooth glide on the track.
– Tightened all bolts and screws for a stable structure.
– Checked for level and made minor adjustments for balance.
– Cleaned the surface for a polished, finished look.
– Unboxed all panels, hardware, and organized
tools for easy access.
– Assembled the main frame, securing side
panels, base, and top.
– Unboxed all panels, hardware, and organized
tools for easy access.
– Assembled the main frame, securing side
panels, base, and top.
– Installed interior shelving and hanging rods
according to layout.
– Mounted the doors and aligned hinges for
smooth, even closure.
– Tightened all connections and ensured
structural stability.
– Cleaned the exterior and interior for a
finished presentation.
Armchair Assembly (Bentwood Style)
– Unboxed and laid out all components,
including the bentwood frame, base supports, and cushions.
– Unboxed and laid out all components,
including the bentwood frame, base supports,
and cushions.
– Assembled the curved wooden arms and
attached the cross-support base.
– Secured the seat frame tightly between the
armrests.
– Installed the cushioned seat and headrest
into the frame.
Tightened all bolts and fasteners for stability.
– Verified rocking motion and balanced
alignment.
– Wiped down the wood and leather to
complete the setup.
– Unpacked all parts and hardware, laying
everything out for quick access.
– Assembled the desk frame and secured the
legs to the desktop.
– Unpacked all parts and hardware, laying
everything out for quick access.
– Assembled the desk frame and secured the
legs to the desktop.
– Installed drawers or shelves (if included),
aligning tracks and fasteners.
– Tightened all screws and bolts to ensure
stability.
– Verified levelness and adjusted as needed.
– Wiped down all surfaces for a clean, ready-
to-use setup.